Construction Code, reading plans and specifications, quantity takeoff and bidding, BSDQ, schedule and critical path, quality control: the GPC exam material, explained step by step.
One-time payment · 12-month access · no subscription
Course outline
Module 1Legislation and regulations2 lessons · 14 questions
Act, regulation, standard: who does what in construction Free: read →
How the Construction Code is organized
Module 2Reading and interpreting plans and specifications2 lessons · 13 questions
Drawings: types, scales, symbols and dimensions
Specifications, addenda and shop drawings
Module 3Cost estimating and bidding2 lessons · 14 questions
A sustainable site: 3RV-E, energy efficiency and heritage
The RBQ GPC exam at a glance
3 hduration
60%pass mark
A · B · C · Dmultiple choice, one correct answer
FR · ENyour choice of language
Documents provided during the exam, according to the RBQ information sheet:
Building Act (CQLR, c. B-1.1)
Act respecting labour relations, vocational training and workforce management in the construction industry (CQLR, c. R-20)
Regulation respecting the professional qualifications of building contractors and owner-builders
Regulation respecting the vocational training of workforce in the construction industry (R-20, r. 8)
Since these texts are handed to you, the exam mainly checks that you know where to look and how to apply the rule. Our explanations point to the section to consult.
Free lesson
Act, regulation, standard: who does what in construction
Act, regulation, standard
An act is passed by the National Assembly (or federal Parliament). Example: the Building Act.
A regulation sets out how an act applies; it is adopted by the government or a body authorized by the act. Example: the Construction Code is a regulation under the Building Act (B-1.1, r. 2).
A standard is a technical document (CSA, ULC, etc.). It becomes mandatory when an act, regulation or contract refers to it.
Three kinds of law
Civil law governs relations between persons (contracts, liability, warranties: Civil Code of Québec). Penal law punishes offences against acts and regulations with fines (for example, working without a licence). Criminal law falls under the federal Criminal Code (for example, criminal negligence causing death on a site).
Provincial and municipal
The Construction Code applies throughout Québec within its scope. Municipalities issue building permits and enforce their planning by-laws (zoning, subdivision) and often their own construction by-law. Before starting, obtain the necessary permits and authorizations.
Laws to know
Text
Body
What it covers
Building Act and Construction Code
RBQ
Quality of work, public safety, licences
AOHS and Safety Code for the construction industry
CNESST
Health and safety on site
Act R-20
CCQ
Workforce, collective agreements
Civil Code of Québec
Courts
Contracts, warranties, legal hypothec
Architects Act, Engineers Act
Professional orders
Work that requires plans sealed by a professional
Environment Quality Act, Cultural Heritage Act
Ministries
Environmental authorizations, protection of heritage property and sites
Roles on a project
The owner (maître de l’ouvrage, client) orders and pays for the work. Professionals (architect, engineer) design and, depending on the contract, supervise. The general contractor carries out or has all the work carried out and often acts as prime contractor under the AOHS. Specialty contractors carry out part of the work. The project and site management respondent is the person who demonstrated these skills for the company.
Key pointsConstruction Code = RBQ regulation. Safety Code = regulation enforced by the CNESST. Building permit = municipality.
FAQ
How long is the Project and Site Management exam?
According to the RBQ information sheet, the exam lasts 3 hours, with a 60% pass mark. Questions are multiple choice; some refer to plans and specifications.
What are the modules of the GPC exam?
Construction activity management, reading and interpreting plans and specifications, cost estimating and bidding, quality control activities, legislation and regulations.
Is the Construction Code provided at the exam?
The RBQ sheet lists the Construction Code (Chapter I, Building, and Chapter I.1, Energy efficiency) as recommended reading. You need to know its organization and main rules.
Who must take the GPC exam?
General and specialty contractors and general owner-builders. The person who passes it can act as respondent for project and site management.
Independent service, not affiliated with the Régie du bâtiment du Québec (RBQ). All questions are original: the RBQ’s official exams are confidential.